+7 916 999 1714 contact@erfagroup.ru hr@erfagroup.ru
  • English
  • Türkçe
  • Русский
ERFA GROUP
Quality Assurance
Rapid On-Site Service
Trust
  • Hakkımızda
  • Hizmetler
  • Tüm Projeler
    • Devam Eden Projeler
    • Tamamlanan Projeler
  • Portfolyo
  • İletişim
  • EnglishEnglish
  • TürkçeTürkçe
  • РусскийРусский
next

High-Technological Multifunctional Medical Complex (HMMC)

next

Gas Processing Plant and Utilities, Infrastructure and Offsite Process Facilities

next

The Hydrocracking Complex. Stage 4 (Raw material preparation plant combined hydrocracking plant)

next

Production of Metallocene Polyethylene 300 Tg, Reconstruction of the Existing Production of (MPE-300)

next

Propane Dehydrogenation and Polypropylene Production Facility (DGP-2)

next

Execution of construction and installation works of the electrometallurgical complex

next

The terminal for transshipment of mineral fertilizers in the commercial seaport of Ust-Luga. Transshipment of ammonia

next

Gas Processing Plant and Utilities, Infrastructure and Offsite Process Facilities

next

New Olefin Complex EP-600

next

Udokan Mining and Metallurgical Plant

next

ARCTIC LNG 2 - AWP-1B module

next

June Shopping Mall Mytischi

next

Kutuzovsky Bussiness Center

next

Aviapark Shopping Mall

next

Riviera Shopping Mall

next

Phosagro Ammonia Plant ( Sojitz / MHI )

next

Sheremetova Airport – B Terminal

next

Sheremetova Airport – C Terminal

next

Sibur ZapSibur - 2 Ethylene Cracker Unit Plant ( SİBUR / Linde )

next

Air Separation Unit (NLMK Group / Linde )

Bağlantılar

  • Hakkımızda
  • Hizmetler
  • Portfolyo
  • Tüm Projeler
© Erfa Group. All rights reserved.